Customer's Name: YUMEX PRINTED CIRCUIT CORPORATION
Location: 122 Progress Aven., Carmelray Industrial Park, Canlubang, Laguna
Type of Industry: Semiconductor / Electronics
System/s Installed: 1-Train REVERSE OSMOSIS (RO) SYSTEM
Capacity: 126,815GPD


System Description:
The system pre-treatment includes Filter media and chemical dosing like chlorine for water disinfection, anti-scalant for membrane scaling protection and UV unit for membrane fouling protection.

The RO System uses an 8-inch by 60-inch TFC membranes. The System is configured into Single Pass, Two Bank Configuration. It has an Auto-flush System and online conductivity meters both for feed and product streams.

The product water is, then passed through a Membrane Degasifier, for dissolved gases removal to elevate the final product water pH.

The System has its own CIP system used for maintenance cleaning.

RO SYSTEM with Membrane Degasifier:Yumex installation





Customer's Name: METROLAB INDUSTRIES, INC.
Location: Gateway Business Park, Gen. Trias, Cavite
Type of Industry: Pharmaceutical
System/s Installed: 1-Train MattUF-DI SYSTEM
Capacity: 14,400 GPD


System Description:
The System pre-treatment includes Filter media like Sand Filter and high grade ACF. Then, a MattUF unit, a custom built ultra-filtration unit designed by Matten for industrial use.

The water produced by the UF unit is passed through a Cation and Anion beds for demineralisation. The de-ionized water is further polished using a Mixed bed de-ionizer.

The polished water is finally disinfected by a UV disinfection unit, collected and used in production.

MattUF-DI SYSTEM:Metrolab installation





Customer's Name: CEBU MITSUMI PHILIPPINES, INC.
Location: MRI Special Economic Zone, Sabang, Danao City, Cebu
Type of Industry: Semiconductor/Electronics
System/s Installed: 1-Train RO SYSTEM
Capacity: 63,400 GPD


System Description:
The System is complete with pre-treatment which includes Sand Filter for suspended particle removal and accompanied with chorine dosing for water disinfection and prevent algae growth. The chlorinated water is passed through an Activated Carbon Filter Media for remove free chlorine.

The dechlorinated water is passed through a Twin Alternating Softener for hardness removal. The removal of hardness causing ions prolonged the life of the RO membrane and prevent from pre-mature scaling. This soft water is collected to a Storage tank.

The soft water is pumped off to the RO System for further purification. This system is Single Pass, Two-Bank Configuration. It has a CIP built with in the system, for periodic maintenance cleaning.

RO System (w/ pretreatment at the back):Cebu Mistumi installation





Customer's Name: NIDEC PRECISION PHILIPPINES CORPORATION
Location: Laguna Technopark, Biñan, Laguna
Type of Industry: Semiconductor/Electronics
System/s Installed: 2-Train UF SYSTEM
2-Train RO SYSTEM
1-Train MIXED BED DI SYSTEM
Capacity: UF – 63,410 GPD (per train)
RO – 31,705 GPD (per train)
MBDI – 126,815 GPD


System Description:
The System is complete with pre-treatment which is UF System for suspended particle removal. The UF filtered water is directed to a storage tank.

The UF filtered water is pumped again to RO System for the removal of dissolved solids. The RO System has a anti-scalant dosing system for membrane protection. The System has its custom built CIP for periodic maintenance cleaning.

The RO permeate water is also directed to a storage tank prior to further demineralization. This filtered water is passed through a working mixed bed for further reach the required resistivity of above 10 megaohm.

The de-ionized water is treated further using a UV disinfection unit before it goes to the production for final usage.

2-Train UF System(left):
2-Train RO System(center):
Mixed Bed DI System(right):
Nidec installation





Customer's Name: MACRO INDUSTRIAL PACKAGING, INC.
Location: Canlubang Industrial Estate, Calamba, Laguna
Type of Industry: Plastic Manufacturing
System/s Installed: 1-Train TWIN ALTERNATING SOFTENER SYSTEM
Capacity: 190,220 GPD


System Description:
The System pre-treatment includes series of cartridge filters for suspended particle removal. Then, the filtered water passed through a Twin Alternating Softening Tanks.

The System has a compact top-mounted valve controller. This Controller has an electronically built in memory chip which controls the rotation of the motorized camshaft especially during the regeneration process.

The Controller is programmable and the opening/closing of the valves are made by the line pressure.

TWIN ALTERNATING SOFTENER SYSTEM:Macro installation





Customer's Name: CEBU MITSUMI PHILIPPINES, INC.
Location: MRI Special Economic Zone, Sabang, Danao City, Cebu
Type of Industry: Semiconductor/Electronics
System/s Installed: 1-Train DUAL BED DI SYSTEM
Capacity: 63,410 GPD


System Description:
The System is mainly composed of a feed motor pump, a TOC Reducer unit, a Dual Bed controlled by a stager controller during the system operation.

The TOC unit is installed upfront to protect the Dual Bed Unit from any organics present in feed water. Thus, prevent the ion exchange resins from premature fouling.

Basically, the Dual Bed is composed of a Cation and Anion Tanks containing a cation resin for removal of positively charged ions and anion resin for removal of remaining negatively ions in water, respectively.

DUAL BED DEIONIZATION SYSTEM:Cebu Mitsumi installation



view client list